Skip to content

Process controls

Technology

How an order moves from incoming material to packed parts.

A coating head guiding clear adhesive film over chrome rollers

Process flow

From incoming material to packing

Each order follows a defined sequence, from incoming material check to packing. Parameters are agreed with the customer before production.

  1. 01Incoming material
  2. 02Slitting
  3. 03Laminating
  4. 04Die cutting
  5. 05Inspection
  6. 06Packing
  • Incoming material check: carrier, adhesive and liner are checked against the specification.
  • In-process checks: width, registration and edge quality are checked during slitting and cutting.
  • Final inspection: parts are checked visually and dimensionally before packing.
  • Packing: parts are labelled and packed for manual or automated assembly.

Parameters

Process parameters

Sample control points; the final scheme is agreed per material and drawing.

Process control points
Control pointWhat is checkedRecord
Incoming materialCarrier, adhesive and liner compared with the agreed specification.100% of lots checked (sample)
In-processChecked at set-up and during the run.Width / registration / edges (sample)
Final inspectionVisual and dimensional check before packing.Sampled per drawing (sample)
Lot recordEach lot can be traced back to the material and the run.Sample retained (sample)

Quotation

Agree the specification before production

Send the drawing, the material and the acceptance criteria. We will confirm the control points.